How to Choose the Right kVA DG Set for Your Building
15 November 2026 · 6 min read · Shine Enterprise, Guwahati
Buying a DG set is a big decision. Pick one that is too small and it trips or struggles every time a motor starts. Pick one that is too big and you pay more upfront, burn fuel inefficiently and run an engine that is rarely worked properly.
The good news: sizing a generator is not difficult if you follow a few clear steps. This guide explains how to work out the kVA rating you need, in plain language, for homes, offices, showrooms, hotels, hospitals and factories.
kW and kVA: what is the difference?
Your appliances and machines are usually rated in watts (W) or kilowatts (kW). Generators in India are rated in kVA (kilovolt-amperes).
The link between the two is the power factor. Kirloskar's DG set specification pages list their ratings at a power factor of 0.8 lagging. For example, Kirloskar lists its 25 kVA model at 20 kW and its 15 kVA model at 12 kW.
So the basic formula is:
kVA = kW ÷ 0.8
If your building needs 40 kW, that works out to 40 ÷ 0.8 = 50 kVA before you add any margin.
Step 1: Decide what the DG set must run
Start by deciding the job of the generator. There are two common choices:
- Essential loads only: lights, fans, lifts, water pumps, computers, billing counters, security systems, and in hospitals, critical medical equipment.
- The whole building: everything, including all air conditioners and kitchen or process equipment.
Running only essential loads can bring the size, and the cost, down a lot. Many buildings put essential circuits on a separate distribution board for this reason.
Step 2: List every load and add up the kW
Make a simple list of every item the DG set will power, with its rating and quantity. You can find ratings on the nameplate or in the equipment manual. Your electrician or site engineer can help.
| Load | Quantity | Rating each (kW) | Total (kW) |
|---|---|---|---|
| LED lights and fans | — | — | [from your list] |
| Air conditioners | — | — | [from nameplates] |
| Water pump / lift motor | — | — | [from nameplates] |
| Computers, servers, UPS | — | — | [from your list] |
| Total running load | Add it up |
Be honest about what will run at the same time. Not every AC, pump and machine runs together all day. Your electrical consultant can apply a sensible "diversity" figure based on how the building is actually used.
Step 3: Allow for motor starting
This is the step most people miss. Motors draw several times their running current for a few seconds when they start. Lifts, water pumps, compressors and air conditioners all have motors.
If a large motor starts while the DG set is already loaded, the voltage can dip and the set may trip. To handle this:
- Note the size of your largest motor, and whether it uses a direct-on-line (DOL) starter, star-delta starter, soft starter or VFD.
- Plan so that large motors start one at a time, not together.
- Share the motor list with your dealer so they can check starting capacity properly.
Step 4: Convert to kVA and leave headroom
Take your realistic running load in kW and divide by 0.8 to get kVA. Then leave some headroom for motor starting and for loads you will add in the next few years: a new floor, extra ACs, more machines.
A generator that runs very lightly for long periods is not ideal either. Diesel engines are designed to work under a reasonable load. That is why you size for real demand plus sensible growth, not "the biggest set we can afford".
A simple worked example
Suppose a small showroom has these loads running together:
- Lights and fans: 6 kW
- Four air conditioners: 8 kW in total
- Billing counters, CCTV and computers: 2 kW
Total running load = 16 kW
16 ÷ 0.8 = 20 kVA.
Now add headroom for AC compressors starting and for a couple of extra ACs next year. A set somewhat above 20 kVA would be the range to discuss with your dealer. Kirloskar's range includes standard ratings such as 20, 25 and 30 kVA, and the final choice depends on the actual motor sizes and how the loads start.
This is an example only. Every building is different, so always confirm sizing with a site survey.
Single-phase or three-phase?
Small homes and shops on a single-phase supply can use a single-phase generator. Most offices, hotels, hospitals and factories have a three-phase supply and need a three-phase DG set. Check your electricity connection before you shortlist models, and make sure loads are spread evenly across the three phases.
Don't forget the panel: manual or AMF?
How the generator takes over when grid power fails also matters:
- Manual changeover: someone switches over by hand. Fine for many homes and small shops.
- AMF (Auto Mains Failure) panel: the DG set starts and takes the load automatically when the grid fails, and hands back when power returns. This is important for hospitals, hotels, lifts and data rooms.
Shine Enterprise supplies AMF panels and other electrical panels alongside Kirloskar DG sets, so the set and the panel are planned together.
Common sizing mistakes to avoid
- Adding up kW and forgetting to convert to kVA.
- Ignoring motor starting for lifts, pumps and ACs.
- Planning for today only and outgrowing the set in two years.
- Oversizing "to be safe" and running the engine lightly for years.
- Not checking space, ventilation and exhaust routing before buying.
How Shine Enterprise helps you choose
Shine Enterprise in Beltola, Guwahati is an authorised dealer of Kirloskar Powergen DG sets, with a range from 1 kW up to 16,000 kVA. Our founder Mr. Sanjib Talukdar has 16+ years in the DG industry, and Kirloskar named Shine the Best Dealer in the entire Northeast for FY 2025-26.
We help you with load assessment, choosing the right model, and full installation guidance, from foundation and cabling to exhaust and commissioning. Browse our Kirloskar DG sets, see a popular small-business model like the Kirloskar 15 kVA, or send us an enquiry with your load list.
Frequently asked questions
How do I convert kW to kVA for a DG set?
Divide kW by the power factor. Kirloskar rates its DG sets at 0.8 power factor, so kVA = kW ÷ 0.8. For example, 20 kW ÷ 0.8 = 25 kVA.
Is it better to buy a bigger generator than I need?
A small margin for motor starting and future growth is sensible. A set that is far too big costs more to buy and runs lightly most of the time, which is not good for a diesel engine. Size for real demand plus planned growth.
What size DG set do I need for my home?
It depends on what you want to run. Lights, fans, a fridge and a pump need much less than a home with several ACs. List your loads, add up the kW and divide by 0.8, then speak to a dealer to confirm.
Can Shine Enterprise visit my site to check the load?
Yes. Call or WhatsApp Shine Enterprise on +91 69136 10033 (Monday to Saturday, 9 AM to 7 PM) and we will arrange a time to look at your site and your load.
Talk to us before you buy
Not sure which kVA is right? Send us your load list or a photo of your main panel and we'll help you shortlist the right Kirloskar DG set.
Call or WhatsApp: +91 69136 10033 Office hours: Monday to Saturday, 9 AM to 7 PM (Sunday closed). Or contact us online.
Need help choosing a Kirloskar DG set?
Monday to Saturday, 9 AM to 7 PM.